You are about to book a landscaper and need to plan around work, material deliveries and the weather. The time a landscaping project takes depends on the size and complexity of the job. Small jobs like laying a new lawn take a matter of days, while a full design and build project takes several weeks.
Hard landscaping forms the built part of a garden, which includes patios, paths, walls, steps, decking, fencing and drainage. Soft landscaping is the living part of the garden, covering the soil, turf, planting and trees. Combining both of these elements takes careful scheduling and a sequence of different trades working in your garden.
A garden designer produces the plan, a landscaper or landscape contractor builds it, and a gardener maintains it. Because these roles are separate, you have to account for the design time before any physical work begins. You also need to allow time for the heavy groundwork that prepares the site for new materials.
Typical times for common jobs
Landscapers price and schedule their work per project after completing a site visit. Typical times differ because of the size of the garden, the number of labourers working on the site and access. Access is one of the biggest factors in how long a job takes, as everything carried through the house adds time and pushes the price up.
The time required for paving depends on the size of the area and the materials used. For example, labour only for a 10 square metre patio takes about two days. A 20 square metre patio takes about three days, and a patio of 40 square metres or more takes four to five days to complete.
The table below shows typical times for specific tasks.
|
Job |
Typical duration |
|---|---|
|
Turf laying |
Half a day to 3 days |
|
Artificial grass |
1 to 2 days |
|
Garden levelling |
1 to 2 days |
|
Raised beds and planting |
2 to 4 days |
|
Softwood decking (20 square metres) |
3 to 5 days |
|
Composite decking (20 square metres) |
4 to 6 days |
|
Indian sandstone patio (25 square metres) |
3 to 5 days |
|
Porcelain patio (25 square metres) |
4 to 6 days |
|
Natural stone patio (25 square metres) |
5 to 7 days |
|
Pond |
1 to 5 days |
These are typical 2026 timescales. Separate figures for 50 square metres put turfing at 1 to 2 days and artificial grass at 2 to 3 days. The two sets of figures were worked out differently, so read them separately, and local quotes will differ with your garden and access.
Whole garden projects
A complete garden transformation takes much longer than a single task because it involves multiple materials and stages of construction. Overall figures for these larger projects differ, so treat them as a guide and ask your chosen contractor for a written programme of work.
Typical 2026 figures put a small refresh at three to five days, a mid-range renovation at two to three weeks and a premium design and build at four to eight weeks. A full design and build for a three-bed semi-detached house is put at three to eight weeks.
Other estimates are different. A small refresh takes a few days to a week, a mid-size redesign with a patio and planting takes two to four weeks, and a large multi-element transformation takes several weeks to a few months, depending on the scope, weather and access. These ranges were worked out differently from the ones above, so read them separately.
Larger jobs are usually paid in stages as the work progresses. You should agree these stages before the work begins so you know exactly what must be completed before the next payment is due. Prices for all landscaping work are generally higher in London and the South East, and you should always check whether the quotes you receive include VAT.
Why jobs overrun
The groundwork that nobody sees is where the bulk of the time goes and where corners get cut by bad tradespeople. Digging out the old garden and laying a solid sub-base takes heavy physical labour. A sub-base is a layer of compacted crushed stone, often called MOT Type 1, which sits under paving and artificial grass to stop the surface from sinking.
Creating the right levels is a slow and precise process. Paving must have falls, which is the slight slope that sheds water away from your house. If a landscaper rushes this stage, water pools on the surface or runs towards your property. Thin or missing sub-base materials are a common reason for paving to fail later, and a good quote will always state the exact excavation depth and sub-base depth.
Drying or curing waits can add days to the project. Concrete bases for walls need time to set before the next stage of building begins. Mortar used for pointing between paving slabs must also cure properly without being washed away by rain. Decking takes time because the contractor must build a sturdy timber frame beneath the surface before laying the softwood, hardwood or composite boards on top.
Waste removal is another factor that slows progress. A trader who carries waste must be a registered waste carrier, and the register is public. Filling skips and moving heavy soil takes time, especially if the only route out is through your home. Avoid doorstep callers offering cheap paving or leftover materials. Watch out for slabs laid on dabs of mortar instead of a full bed, or artificial grass laid straight onto bare soil.
Weather, frost and the seasons
Hard landscaping can be done year-round, but the weather dictates the pace of the work. Ground frost can delay certain work, including groundworks and turf laying. Heavy winter rain turns exposed soil into mud, which slows down digging and can delay planting until the ground dries out.
Demand for landscaping peaks in the spring and summer months. This rush can mean longer lead times before a contractor is available to start your project, though no typical booking lead time is available. You might find that winter is quieter, and some landscapers may offer more competitive rates during these colder months.
Read more about planning around the weather in the guide on the best time of year to landscape a garden.
Design time before any digging
Before a landscaper lifts a spade, you need a clear plan. A garden designer produces this plan, and their design fees are usually charged separately from the landscaping work. The design phase involves site surveys, initial sketches, choosing materials and refining the final layout.
A design-only service typically takes two to four weeks, and a full design phase can take four to 12 weeks to complete. You should factor this design time into your schedule if you want a complete redesign rather than a simple replacement of an existing patio.
The Society of Garden and Landscape Designers is the professional body for designers. Membership is a good sign, not a guarantee. Taking the time to finalise your design means your landscaper can order the exact materials needed, which prevents delays later in the project.
What to ask for in writing
Landscaping is not a licensed trade, so vetted membership and evidence of past work matter when choosing a contractor. The British Association of Landscape Industries says its Accredited members are vetted on workmanship, skill and health and safety. The Association of Professional Landscapers says members are assessed, regularly inspected and TrustMark accredited. TrustMark is the government-endorsed quality scheme.
You should always get agreements in writing. A quote is a fixed price, while an estimate is just a rough guess that can change. Citizens Advice suggests getting three written quotes, a written contract, and paying deposits of no more than 25 per cent. They also advise paying by card for extra protection.
According to Citizens Advice, your written contract should clearly cover:
- The agreed start date and the expected duration of the work
- What happens if bad weather delays the project
- Who is responsible for tidying up and removing waste
- Which materials and equipment are included in the price
- Whether the landscaper will use subcontractors for any part of the job
- The payment schedule and when the final balance is due
If a landscaper gives you a daily rate rather than a fixed project price, ask them for the expected number of days the job will take. You should also ask them to define exactly what counts as a working day. Never accept cash deals with no written specification, as you will have no proof of what was agreed if things go wrong.
To understand the financial side better and see what drives the price up, read the guide on garden landscaping cost.
How to prepare your garden and access
Preparing your property before the landscapers arrive will help the job start on time. Access is a major factor in how fast the work progresses. If you live in a terraced house with no rear gate, all materials and waste must go through your living space. This slows the job down and increases the final cost.
You can speed up the process by getting the site ready in advance. Follow these steps to prepare your home for the work:
- Clear the working area of pots, garden furniture and toys
- Unlock side gates and ensure the path is clear of obstructions
- Tell your neighbours about the start date and expected material deliveries
- Protect your indoor floors with heavy-duty dust sheets if access is through the house
- Move your vehicles so delivery lorries and skips can park close to your property
Clear communication with your landscaper about parking restrictions and access times will prevent delays on the first morning. If materials cannot be delivered close to the garden, the labourers will spend hours just moving stones and soil before any real work begins.
What to do if the job drags on
Projects can fall behind schedule due to bad weather or delayed materials. If the site sits empty for days or progress feels too slow, you should address the problem immediately rather than waiting for the end of the project.
Under the Consumer Rights Act 2015, work must be done with reasonable care and skill. If it is not, you can ask for it to be put right or seek a partial or full refund. You might also be able to cancel within 14 days of agreeing a contract, depending on where and how you signed it.
If the job drags on, you should follow these steps:
- Talk to the trader first to ask why the work is delayed and when it will restart
- Keep a written record of all conversations, emails and text messages
- Take dated photographs of the garden to document the lack of progress
- Check your contract before paying the next stage of the bill, and pay only for work that is complete
- Contact Citizens Advice if you need help resolving a dispute
Common questions
Do I need planning permission for a new patio?
Paving more than 5 square metres of a front garden with an impermeable surface that does not drain to a permeable area needs planning permission. Permeable surfacing does not need permission. These rights apply to houses, not flats or maisonettes, and listed buildings need consent for significant work. If you are unsure, you should check with your local council.
How high can I build a garden fence?
Fences and walls can be up to 1 metre high if they are next to a road or its footpath. They can be up to 2 metres high elsewhere. If you want something taller, or are unsure, check with your local council.
Does garden decking need planning permission?
In England, decking is permitted development if it is no more than 30 centimetres above the ground. Together with extensions and outbuildings, the decking must cover no more than 50 per cent of your total garden area. If it exceeds these limits, check with your council before you build.
Can a landscaper remove a protected tree?
A Tree Preservation Order makes it an offence to cut down, lop, uproot or damage a protected tree without the council's consent. Work on trees in a conservation area also normally needs six weeks' notice to the council. You must check these rules before asking a landscaper to clear your garden.
Next steps
Before you hire a landscaper, make sure you know exactly what the job involves and how long it will take. A detailed specification protects you from unexpected delays and rising costs.
- Decide on your layout and materials before you invite tradespeople to quote
- Ask for a written specification that details the excavation depth and sub-base depth
- Check that the quote states named materials, drainage plans and waste removal
- Look for evidence of past work and ask to speak to previous customers
- Check the public register to ensure the trader is a registered waste carrier
- Withhold your final payment until you have checked the work is finished to standard
When you have a clear plan and a realistic schedule in mind, you can find a landscaper near you to request site visits and written quotes.